The CGT on the sale of a UK residential property, by a UK resident, which must be paid within 60 days of completion of the contract. This needs to be taken into account when making EIS investments to defer the payment of CGT
This content is only available upon subscribtion to Techlink.
Tags: EIS TYE case study deferral
Technical Connection Ltd, Floors 1-3, 116 Brompton Road, Knightsbridge, London, SW3 1JJ
Tel: 020 7405 1600
Fax: 020 7405 1601
Email: enquiries@technicalconnection.co.uk